Welcome to UI Hardware Page!
PLEASE--check the UI file drawer for broken C1-bases when returning!
Highest Priority Items
- Confirm C1 cable timing cable adjustments with beam
--I (JW) bought and scrounged a large number in the file cabinet
right above the Illinois cablinet in North counting room.
- Complete minipulse studies
--Would like to restore cabling for data when complete
-
Meaure MH12 latch timing and check out discriminator/latch
--This is super important and super priority
- Measure pedistal widths in beam conditions if possible and at
at least with analysis magnets on.
- Check Cerenkov counter pedistal widths with analysis magnets on
--Magnet power supply may produce additional RF source.
- Complete TDC ECL cabling if beam is down
- Cables on upper west gallery of counting house need checking
- Please leave CT cables in place on top of C1 in case we need to
go back to them.
- Write required on-line software
Muon system
See the new Muon page!
C1
Others
C1 Gas Procedures
Old hardware web pages 5/21/96 |
7/6/96 |
7/28/96
target as of Sept 16,1996