Contents

-Home Page

PMT Testing

-Index Page
-Production Status
-Photos
-Documentation

Sub-Module

-Index Page
-Production Status
-Photos
-Documentation

General

-Documents
-Current Members
-Previous Members
-Physics Pictures

-Links
-E-mail Our Group
ATLAS TileCal Submodule Production Photos (2001)



Yummmmm...Greasy spacers, all you need for a healthy start to the day.

Toshi washes plates 'cause it's his job.

Dave: Hey Nathan! Catch!

Nathan: OK, I got it!

James and Toshi decided Francois wasn't a good enough mascot, so they made one.

The glue machine is like Dave, grumpy and cranky, but works most of the time

Here's Dave and the glue machine now. Aren't they cute?

A finished submodule being squished

A submodule being final welded (welder not pictured).

After welding, we paint. Here's the tank.

After the paint dries, the submodule is wrapped and sent to Argonne.

This job is exhausting!