|
Contents
-Home Page
PMT Testing
-Index Page
-Production Status
-Photos
-Documentation
Sub-Module
-Index Page
-Production Status
-Photos
-Documentation
General
-Documents
-Current Members
-Previous Members
-Physics Pictures
-Links
-E-mail Our Group
|
ATLAS TileCal Submodule Production Photos (2001)
Yummmmm...Greasy spacers, all you need for a healthy start to the day.
|
Toshi washes plates 'cause it's his job.
|
Dave: Hey Nathan! Catch!
|
Nathan: OK, I got it!
|
James and Toshi decided Francois wasn't a good enough mascot, so they made one.
|
The glue machine is like Dave, grumpy and cranky, but works most of the time
|
Here's Dave and the glue machine now. Aren't they cute?
|
A finished submodule being squished
|
A submodule being final welded (welder not pictured).
|
After welding, we paint. Here's the tank.
|
After the paint dries, the submodule is wrapped and sent to Argonne.
|
This job is exhausting!
|
|