Contents

-Home Page

PMT Testing

-Index Page
-Production Status
-Photos
-Documentation

Sub-Module

-Index Page
-Production Status
-Photos
-Documentation

General

-Documents
-Current Members
-Previous Members
-Physics Pictures

-Links
-E-mail Our Group

Summary/Status
of
ATLAS Tilecal Production PMT Testing at UIUC

Last Updated:         Friday, January 31, 2003


UIUC PMT Testing Status:

STEP-1 Testing (DC Light) Batch # 1 Batch # 2 Batch # 3-3 Batch # 4-1 Batch # 4-5 Batch # 5-2 Batch # 6-2 Batch # 7 Batch # 8 Batch # 9-2 Batch 10-2 Total
# STEP-1 PMT Grids (PMTs) Measured:  - (-) - (-) 13 (250) 13 (250) 13 (250) 13 (250) 13 (250) - (-) 13 (250) 13 (250) 13 (250) 104 (2000)
# PMTs Passing (Failing) Step-1 Test:  - (-) - (-) 242 (8) 248 (2) 243 (7) 248 (2) 243 (7) - (-) 247 (3) 249 (1) 249 (1) 1969 (31)


STEP-2 Testing (Pulsed Light) Batch # 1 Batch # 2 Batch # 3-3 Batch # 4-1 Batch # 4-5 Batch # 5-2 Batch # 6-2 Batch # 7 Batch # 8 Batch # 9-2 Batch 10-2 Total
# STEP-2 PMT Grids (PMTs) Measured:  - (-) - (-) 13 (250) 13 (250) 13 (250) 13 (250) 13 (250) - (-) 13 (250) 13 (250) 13 (250) 104 (2000)
# PMTs Passing (Failing) Step-2 Test:  - (-) - (-) 250 (0) 250 (0) 249 (1) 249 (1) 250 (0) - (-) 250 (0) 250 (0) 250 (0) 1998 (2)


Henri Poulet - He's our ATLAS TileCal QC Man !